adarsh
2010-11-24 06:14:35 UTC
Hi all,
I am successfully configured SGE cluster on 4 nodes.
Now,I am researching about Job Scheduling in SGE.I want to achieve someHardware Level Scheduling in SGE
Is it possible in SGE to execute heavy jobs at special nodes( quad-core CPU's ). How it works?
What I think that we have to make seperate queues having high and low loads.
Yet I need some confirmation.
Thanks & Regards
Adarsh Sharma
------------------------------------------------------
http://gridengine.sunsource.net/ds/viewMessage.do?dsForumId=38&dsMessageId=298227
To unsubscribe from this discussion, e-mail: [users-***@gridengine.sunsource.net].
I am successfully configured SGE cluster on 4 nodes.
Now,I am researching about Job Scheduling in SGE.I want to achieve someHardware Level Scheduling in SGE
Is it possible in SGE to execute heavy jobs at special nodes( quad-core CPU's ). How it works?
What I think that we have to make seperate queues having high and low loads.
Yet I need some confirmation.
Thanks & Regards
Adarsh Sharma
------------------------------------------------------
http://gridengine.sunsource.net/ds/viewMessage.do?dsForumId=38&dsMessageId=298227
To unsubscribe from this discussion, e-mail: [users-***@gridengine.sunsource.net].